Yes I know its very early to be talking about this but with the amount of work ive still to do to my car the 12 weeks that's left doesn't leave me with much timeespecially as I know how slow I work
Here is my list of the jobs that I need to do in no particular order, im going to forget some but will add them when I remember and more importantly for me I will tick them off as and when I complete them
#### means job jobbed.
1, Finish off stitch welding my subframe ####
2, Weld in brace on wishbones ####
3, Sand and paint driveshafts, steering rack, track rod ends and basically anything that cant be powder coated
4, Send all brackets, suspension parts, mounts etc off to be powder coated inc the subframe ####
5, Clean up and repaint my spax front shocks
6, Fit shocks up with new bushes, top mounts and bearings
7, Take off the rest of the aftermarket sideskirts and then cut out the rotten part of the sill and weld in the new pattern sills that ive got
8, Add abit of fibreglass to the o/s rear arch where the filler cap would sit, my tank is inside
9, Prep oe sideskirts and rear arches for re paint
10, Weld in lots of little oe holes in engine bay (im after a cleaner look)
11, Do some stitch welding in engine bay
12, Relocate brake fluid reservoir into scuttle area ####
13, Make an air filter box behind passenger headlight
14, Prep engine bay, wheel arches, new sills etc for respray
15, Mildly strip engine down and install piper 285 cam, springs etc (not going to happen till winter)
16, Strip old paint and then re paint engine block (im thinking off using 2k, has anyone done this before)
17, Paint gearbox with 2k paint
18, Clean my carb as best as I can
19, Put everything back
20, Mot and drive the old girl
21, Weld in a flexi/anti vibration exhaust pipe into my mid section (not sure what they are called)
22, Put new valeo clutch on, probably get the flywheel cleaned/ resurfaced.
Sorry for the long list but it will help spur me on, so whats on your to do list guys and gals.